My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-12-27_HYDROLOGY - M1977378 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1999-12-27_HYDROLOGY - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 12:49:51 PM
Creation date
8/10/2012 10:58:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
12/27/1999
Doc Name
November 1999 Monthly Report
From
Sunnyside Gold Corp.
To
CDPHE-WQCD
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 1999 Monthly Report <br /> Page 2 <br /> Sunnyside submitted completion certifications in October, 1997. <br /> • Sunnyside Mine Pool Mitigation—Alkaline Solution Injection <br /> This project was not active in November of 1999. <br /> The water pool pH, at the American Tunnel bulkhead, was 4.87 and the bulkhead gage <br /> read 420 psi at the end of November. This would indicate that a rise in the mine pool <br /> occurred since the end of October (2 feet). Sunnyside will continue to monitor these <br /> parameters. <br /> "B List" Projects <br /> • Columbus Mine Portals— Mine Waste Dumps <br /> • London Mine Portals—Waste Dumps <br /> Work, permitting or arrangement for access is not planned until it becomes evident that <br /> the work plans for these projects require implementation. <br /> • Mayflower Facility—Upland Hydrological Control <br /> This project was completed in October, 1999 and accepted by DMG as complying with <br /> the Consent Decree work plans and MLR Standards in November, 1999. <br /> • Tailings Pond No. 4 Surface Drainage Modification <br /> This project was completed in November, 1999 and inspected by DMG for compliance <br /> with the Consent Decree work plan and MLR Standards. <br /> • Tailings Pond No. 4 Upland Groundwater Diversion <br /> Sunnyside had been holding discussions with BLM to implement this project in exchange <br /> for an area to place material from their Lackawanna mill tailings remediation project. <br /> Since it became apparent that the work on this project would not be completed by BLM <br /> in the allotted time frame, Sunnyside assumed project construction. By month end, the <br /> work area had been stripped of overburden material to the impermeable clay seam found <br /> in the exploratory holes and approximately 400 feet of interception/d 1 version ditch had <br /> been excavated. Projection completion is planned for December. <br />
The URL can be used to link to this page
Your browser does not support the video tag.