Laserfiche WebLink
C j <br /> Sheet 1 of 3 <br /> Colorado Division of Minerals and Geology <br /> ----------------------------------------- <br /> ESTIMATING FORM - TRUCK/LOADER TEAMS <br /> ------------------------------------ <br /> ------------------------------------ <br /> Task No. 1 Prep. By: WHE Permit No. M-77-378 <br /> ---------- --------- -------- <br /> Date 02/03/98 Filename: M378-1 Operation: Sunnyside Mine <br /> ---------- --------- ------------------------------ <br /> Permit Action SL-01 Recal. <br /> ------------------------------------------------------------- <br /> Task Description BackfilL subsidence feature at Lake Emma <br /> ------------------------------------------------------------- <br /> HOURLY EQUIPMENT COSTS: <br /> Single, Double or Triple <br /> County: SAN JUAN Labor Zone 2 Shifts S <br /> ------------ -------- ---------- <br /> Equipment Descriptions <br /> Truck/Load team - Truck GENERIC 18t, 12.0 to 18.0 cy, on or off-highway <br /> - Loader CAT 966F <br /> Support equip. - Load area: CAT D8N w/S-U.blade & 3-sh. ripper <br /> - Dump area: CAT 825C self propelled sheepsfoot <br /> Road maint. - Grader N/A <br /> - Water T. N/A <br /> --------------------------------------------------- <br /> Truck/Load Team Support Equipment Road Maintenance <br /> Truck Loader Load area Dump area Grader Water T. <br /> Equipment Filename: 18CYHLTK 966FLODR D8N-V3RP 825C-CMP N/A N/A <br /> -------- -------- -------- -------- --------- ------- <br /> Utilization on job <br /> -Machine: 99% 100% 100% 100% N/A N/A <br /> -Ripper N/A N/A 25% N/A N/A N/A <br /> -------- -------- -------- -------- --------- ------- <br /> Cost Breakdown <br /> -------------- <br /> Ownership cost/hr: $18.66 $25.03 $43.10 $62.23 N/A N/A <br /> Operating cost/hr: $21.72 $25.93 $55.03 $48.31 N/A N/A <br /> Ripper Op. cost/hr: $0.00 $0.00 $1.70 $0.00 N/A N/A <br /> Operator cost/hr: $21.40 $22.04 $23.12 $23.12 N/A N/A <br /> -------- -------- -------- -------- --------- ------- <br /> Unit subtotals $61.78 $72.99 $122.96 $133.66 N/A N/A <br /> -------- -------- -------- -------- --------- ------- <br /> # of eqp. units 2 1 1 1 0 0 <br /> ---- ---- ---- ---- ---- ---- <br /> Group subtotals- T/L team $196.55 Support: $256.62 Rd. Maint.: $0.00 <br /> --------- --------- --------- <br /> Total Work Team Cost/Hr $453.17 <br /> MATERIAL QUANTITIES: <br /> ------------------- <br /> ------------------- <br /> Beg. <br /> Volume: 35,000 LCY <br /> Cu.Yd. ---------- Swell Loose <br /> Volume: 35,000 LCY Factor: N/A Volume: 35,000 LCY <br /> ---------- ---------- ----------- <br /> Source of quantity take-off: Exhibit L & C4b <br /> --------------------------------------------------- <br /> Source of est. swell factor: NA <br /> --------------------------------------------------- <br />