Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br /> H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br /> Task No.l Task Description Cost ($) <br /> --------I-------------------------------------------------- ------------ <br /> NA I Not required in Reclamation Plan <br /> ------------------------------------------------------------------------ <br /> Subtotal (H): <br /> I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br /> Task Nod Task Description Cost ($) <br /> --------I-------------------------------------------------- ------------ <br /> NA Upland diversions for tailings ponds are <br /> permanent. Additional drainage controls <br /> provided under tasks 4, 7, 10, 13 <br /> --------------------------------------------------------------�---------- <br /> Subtotal (I): <br /> J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br /> Task Nod Task Description Cost ($) <br /> --------I-------------------------------------------------- ------------ <br /> 3 Construct earthen cover for clay Liner $23,703 <br /> covering Lake Emma subsidence feature <br /> ------------------------------------------------------------------------ <br /> Subtotal (J): $23,703 <br />