Laserfiche WebLink
BUCKLEN EQUIPMENT CO PIT - ID# M- 1982 -131 I BUCKLEN EQUIPMENT CO <br />Technical Revision <br />EXHIBIT D <br />Exhibit D has been revised as follows from the Amended Mine Permit as approved April 16, 1993. <br />Deletions are indicated by strikeout, additions are noted by bold text. <br />MINING PLAN <br />Amendment Area A is the area to be mined. This area is along the Cache la Poudre River east of <br />21St Avenue, north of the Colorado and southern Railroad, and west of the City of Greeley Island <br />Grove Park. The total area to be mined is approximately 30 acres. <br />Amendment Area B will be used as a temporary location for the portable processing plant while <br />the mining is being completed in the current permit area. Area B will be used for some stockpiling. <br />This area is approximately 24 acres. <br />The proposed mining method will be done as a dry mining operation. The existing mining area <br />has operated as a dry mining operation for the past 100 years. A dewatering trench will be <br />constructed around the perimeter of the mining area by phases and water will be removed by <br />pump to an adjacent pond for settling and percolation into the alluvium. The location of the pond <br />is shown on Exhibit C. <br />The deposit to be mined is the valley fill deposit along the Cache la Poudre River. This deposit <br />consists of sands and gravels with interspersed layers of silt and clay lenses. The deposit is <br />relatively well graded and has aggregates as large as 12 inches and many fines passing the 200 <br />micron sieve. The material will mainly be used as a pit run product. This means there is little <br />crushing or washing done and it is excavated and hauled directly from the site. Occasionally <br />some of the material will be washed and crushed. Approximately 5% of this material becomes <br />reject or waste and is used for backfilling in reclamation. <br />This area will be mined in two phases using scrapers and front -end loaders. We expect the <br />mining to last for twenty (20) years. <br />Phase 1 will start on the northeast side of the property and move to the southeast. Material in the <br />lowlands area along the Poudre River and the City of Greeley Island Grove Pond will be removed <br />and cleaned up first. Approximately 8.53 acres will be disturbed in Phase 1. During the initial <br />phase of the mining, there will be very little topsoil to be removed. All overburden and topsoil was <br />removed by previous mining operators. <br />The portable processing plant will be moved into area A during the mining of Phase 1. This plant <br />will be located at the site of the Old Farmhouse. (The farmhouse was given to the Western Hills <br />Fire Protection District and was recently burned for training and practice.) <br />Phase 2 of the operation will then begin in the uplands farm field as shown on Exhibit C. A <br />dewatering trench will be constructed around the entire parcel as shown on Exhibit C and the <br />Page 1 of 12 <br />