Laserfiche WebLink
Page 1 of 2 <br />Task description: <br />Site: Deserado Mine <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 8/9/2012 County: Rio Blanco <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown <br />NA <br />Total unit Cost/Hour: $251.56 <br />Total Fleet Cost/Hour: $251.56 <br />MATERIAL QUANTITIES <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$72.40 <br />NA <br />Operating Cost/Hour: <br />$140.68 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />100 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $251.56 <br />Total Fleet Cost/Hour: $251.56 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />841 <br />Swell factor: <br />1.165 <br />Loose volume: <br />980 LCY <br />Permit Action: MR 153 <br />Source of estimated volume: Division of Reclamation, Mining & Safety; Map 157 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />BULLDOZER WORK <br />ade T «•o De« atering Exnansion Ponds <br />50 feet <br />2.110.5 LCY/hr <br />Materials consistency description <br />Average push gradient <br />Average site altitude: <br />0% <br />acted fill or embankment 0.9 <br />5,650 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AV&) <br />Material consistency: 0.900 <br />(CAT HB)) <br />Dozing method: 1.000 <br />GEN.) <br />Pennit/Job #: C1981018 <br />Abbreviation: None <br />Filename: C018 -001 <br />CIRCES Cost Estimating Software <br />