Laserfiche WebLink
COST SUMMARY WORK <br />Task description: B -Seam Dewatering Expansion <br />Site: Deserado Mine Permit Action: MR 153 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 8/9/2012 County: Rio Blanco <br />User: ZTT <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />!]v�1,j:1D1_1 P7_ju0192i]oll <br />Liability insurance: <br />2.02 <br />Form <br />Fleet <br />Task <br />1.05 <br />Task <br />Description <br />Used <br />Size <br />Hours <br />Cost <br />001 <br />Regrade Two Dewatering Expansion Ponds <br />DOZER <br />1 <br />1.04 <br />$262.85 <br />002 <br />1 <br />$54.82 <br />Replace Topsoil from Stockpile to Dewatering <br />DOZER <br />0.20 <br />Expansion Ponds <br />E7 SUBTOTALS: <br />1.24 <br />$ $317.67 <br />INDIRECT COSTS <br />!]v�1,j:1D1_1 P7_ju0192i]oll <br />Liability insurance: <br />2.02 <br />Total = <br />$6.42 <br />Performance bond: <br />1.05 <br />Total = <br />$3.34 <br />Job superintendent: <br />0.62 <br />Total = <br />$36.77 <br />Profit: <br />10.00 <br />Total = <br />$31.77 <br />Total = <br />$0.00 <br />TOTAL O & P = <br />$78.30 <br />TOTAL INDIRECT COST = <br />CONTRACT AMOUNT (direct + O & P) = <br />$395.97 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />4.25 <br />Total = <br />$16.83 <br />Reclamation management and /or administration: <br />3.25 <br />$12.87 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$108.00 <br />Permit/Job #: C1981018 <br />Abbreviation: None <br />Filename: 0018 -000 <br />TOTAL BOND AMOUNT (direct + indirect) = $42-5.67 <br />