Laserfiche WebLink
999 <br /> necelved <br /> 4SEP 2 p 1999 <br /> SUNNYSIDE GOLD CORPORATION Duran <br /> AN ECHO 8AY COMPANY ONlsion ofM°eIeld0�. <br /> RE COVED als J Gee <br /> P.O. Box 177 • SlIverton, CO 81433 °logy <br /> Phone (970) 387-5533 • Fax (970) 387-5310 <br /> September 16, 199PIJAE/vV��Ms. Sarah Johnson �/ ��/� <br /> �/ OF��c� <br /> CDPHE— Assessment UnitL �� 4'�� <br /> Water Quality Control Division'" l�iy�r��•.��lt `fig <br /> 4300 Cherry Creek Drive South <br /> Mail Code; WQCD-AU-B2 <br /> RE: August 1999 Monthly Report and DMRs for CDPS Permit No. CO-0044768 —Mine <br /> Remediation Projects, San Juan County <br /> Dear Ms. Johnson: <br /> The following is submitted to satisfy the August 1999 Monthly and DMR reporting <br /> requirements for CDPS Permit No. CO-0044768 —Mine Remediation Projects and the <br /> related Consent Decree agreement. <br /> Project Status: <br /> "A List" Projects <br /> • American Tunnel Mine Waste Dump <br /> • Boulder Creek Tailings Project <br /> • Surface Mill Tailings at Eureka <br /> • Gold Prince—Mill Tailings <br /> • Ransom Tunnel <br /> • Longfellow—Koehler Mine Waste Project <br /> • Pride of the West Tailings <br /> These projects were completed and accepted by DMG as complying with the Consent <br /> Decree work plans and MLR Standards in 1997. Monitoring and maintenance is the only <br /> additional work planned for these sites. <br /> Confirmation of completion by CDPHE has been received for two of these projects — <br /> Surface Mill Tailings at Eureka and Ransom Tunnel. Sunnyside has not received <br /> confirmation of completion from CDPHE for the remaining five projects although <br />