Laserfiche WebLink
GUNNYSIDE GOLD CORPORATION <br /> AN ECHO SAY COMPANY <br /> P.O. Box 177 .Silverton, CO 81433 <br /> Phone (303) 387-5533 .Telecopy (303) 387-5310 <br /> May 19 , 1997 <br /> Ms. Sarah Johnson <br /> Water Quality Control Division <br /> Colorado Department of Public Health & Environment <br /> WQCD-PE-B2 <br /> 4300 Cherry Creek Drive South <br /> Denver, CO 80222-1530 <br /> RE: CDPS No. CO-0044768, San Juan County <br /> Bulkhead design submittal for MRP-Ransom Portal <br /> Dear Ms. Johnson: <br /> This submittal is to satisfy the work plan commitment (Section 4. , <br /> Inspection and Record Keeping, Reporting) to submit a bulkhead <br /> design for the Ransom Tunnel prior to installation. <br /> The tunnel was opened and inspected for a suitable bulkhead site. <br /> In consultation with Mr. John Abel Jr. , during a site visit for <br /> this purpose, a suitable site for bulkhead placement was selected. <br /> This site is 319 feet from the portal . A bulkhead design for this <br /> site has been prepared by Mr. Abel and it is attached for your <br /> review. <br /> This design is similar to those for the bulkheads placed in the <br /> Sunnyside Mine which were also designed by Mr. Abel. <br /> Please contact me if you have any questions. <br /> Sincerely, <br /> Larry Perino <br /> Reclamation Manager <br /> cc: Wally Erickson, DMG <br />