Laserfiche WebLink
Implementation of dust control mitigation plans where required or <br />necessary <br />Implementation of best use practices to avoid unwanted erosion or <br />sedimentation <br />Recovery of waste materials <br />Hauling of hazardous materials <br />Limiting the height of stockpileswhere possible <br />Maintaining landscaping, weed control and vegetation viability for the life <br />of the project <br />Preservation of significant vegetation whenever possible <br />Effective use of berming or screening techniques if required <br />Locating processing areas behind stockpiles or at the bottom of <br />excavation <br />- Utilization of acoustically insulated housing or covers on all <br />motors /engines <br />If you have any questions or would like to discuss any of the issues addressed herein, <br />please do not hesitate to contact me directly. <br />Thank you. <br />Mark S. Castrodale <br />County Planner <br />Ouray County Land Use <br />(970) 626 -9775 x17 <br />mcastrodale @ouraycountyco.gov <br />CC. <br />Bob Oswald <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street - Room 215 <br />Denver, CO 80203 <br />