My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-30_REVISION - C1981019 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2012-07-30_REVISION - C1981019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:21 PM
Creation date
8/6/2012 1:31:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
7/30/2012
Doc Name
Preliminary Adequacy Review
From
Colowyo Coal Company
To
DRMS
Type & Sequence
RN6
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COAL <br />•,, <br />411°0 . <br />'Y <br />"'• � Op LE.PRODOCl 1014 <br />Response: Colowyo believes Map 28 currently reflects accurate information <br />for the next permit term and an update is not necessary under this renewal. <br />b. Map 28B Topsoil Handling South Taylor Area was updated 11/26/2011 during <br />MR114. Please confirm that this map reflects the topsoil handling plans for <br />the next permit term and update this map as necessary. <br />Response: Colowyo believes Map 28A currently reflects accurate information <br />for the next permit term and an update is not necessary under this renewal. <br />c. South Taylor Pit Topsoil mass balance Table 2.04.9 -7 was last updated <br />January 2008. Please review this table and update the topsoil mass balance <br />values to reflect the current (2012) conditions and projected permit term <br />values. <br />Response: Table 2.04.9 -7 has been updated as requested. The estimated <br />volumes reflected in the revised table take into account current mining <br />projections through the life of the South Taylor Pit. The old version of this <br />table included mining and stripping to the east of the current pit shell which <br />was eliminated in the mine plan under TR -81. <br />d. Based on the Division inspection on April 18, 2012, topsoil stockpile 16D <br />needed significant work. There was a large gully on the south side, and the <br />ring ditch needed to be re -cut on the east and south sides where it is missing <br />in places and blown out in other spots. <br />Response: As noted verbally to the Division during the inspection on May 22, <br />2012 the items needing repaired on Topsoil Pile 16D have been completed <br />except the low spot containing water. The Division also noted in the May 22, <br />2012 inspection report that all items except the low spot have been repaired. <br />As soon as the low spot dries out enough to allow equipment in the area it <br />will be repaired. <br />6. Disposal of Excess Spoil <br />No issues were identified with excess spoil. Colowyo is in compliance with <br />Section 4.09 of the Rules, and no response is required. <br />7. Issues in Permit Application Package (PAP) <br />A Western Fuels - Colorado, LLC mining property <br />
The URL can be used to link to this page
Your browser does not support the video tag.