My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-30_REVISION - C1981019 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2012-07-30_REVISION - C1981019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:21 PM
Creation date
8/6/2012 1:31:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
7/30/2012
Doc Name
Preliminary Adequacy Review
From
Colowyo Coal Company
To
DRMS
Type & Sequence
RN6
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5731 State Highway 13 <br />July 27, 2012 <br />Mr. Rob Zuber <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Colowyo Coal Company L.P., Mine Permit C -81 -019, Preliminary Adequacy <br />Review, Permit Renewal 6 (RN -06) <br />Dear Mr. Zuber, <br />Colowyo Coal Company L.P. (Colowyo) received preliminary adequacy review <br />comments from the Division of Reclamation, Mining and Safety (Division) on <br />May 29, 2012. Colowyo has the following responses to the Division's comments: <br />1. Stipulations <br />Response: No response required. <br />COAL <br />COMPANY b4 <br />.� mount °i° <br />• Meeker, Colorado 81641 <br />a. Currently Colowyo has five outstanding stipulations. Four of these are <br />related to potential development of the Lower Wilson Area and are not an <br />issue at this time. No response is required from CCC. <br />b. The remaining stipulation, Stipulation 7, relates to a groundwater point of <br />compliance. This stipulation needs to be resolved between CCC and the <br />Division. <br />Response: Points of compliance monitoring for the existing operation and <br />South Taylor have been discussed and debated several times in the near past, <br />most recently during the last mid -term review and permitting efforts <br />regarding PR -03. Colowyo's response to the most recent mid -term review <br />dated July 9, 2010 (to Mr. Jim Stark) refer to the two justifications provided <br />and incorporated into the permit text against initiating points of compliance <br />monitoring since 2001 and the specific justifications incorporated into the PR- <br />03 (Collom Expansion) package addressing points of compliance for the <br />existing operations in addition to the Collom area. Please refer to the <br />justification submitted in PR -03 Volume 15, Rule 4 pages 16 -21 (footer date <br />of 9/28/2011). Brant Dennis, a Certified Professional Geologist with extensive <br />A Western Fuels- Colorado, [[C mining property <br />• 970- 824 -1500 <br />RECEIVED <br />JUL 3 0 2012 <br />DivisioA of tieclamation, <br />Mining and Safety <br />
The URL can be used to link to this page
Your browser does not support the video tag.