Sec. 22: Portion of NW /4NW /4, on lands owned by the Union Pacific Railroad
<br />Township 13 South, Range 92West, 6 PM
<br />Sec. 1: SE /4
<br />Sec. 12: lots 1,2,7,8,9, and 10
<br />Township 12 South, Range 91 West, 6th P M
<br />Sec. 27: SW /4, S /2SE /4, S /2NE /4SE /4, S /2NW /4SE /4
<br />Sec. 28: E/2 SE /4
<br />Sec. 33: Lots 1, 2, 3, 6, 7, 8, 10,11, 12, 14, 15, 16, S E /4NW /4, S /2NE /4, N E /4NE /4
<br />Sec.34: ALL
<br />Sec. 35: SW /4 Lot 18, NW /4 Lot 19
<br />* North of Deer Trail Ditch
<br />The portions of the legal description listed above that will be added to the Bowie No. 2 Mine permit
<br />boundary by this revision are as follows:
<br />Township 13 South, Range 91 West, 6th P M
<br />Sec. 5: S /2SE /4, SE /4SW /4
<br />Sec. 6: lots 5, 6, 7, SW /4NE /4, SE /4NW /4, E /2SW /4, SE /4
<br />Sec. 7: ALL
<br />Sec. 8: W/2, W /2SE /4
<br />Sec. 17: NW /4, W /2NE /4
<br />Sec. 18: Lots 1,2, NE %, E /2NW /4
<br />Township 13 South, Range 92West, 6 PM
<br />Sec. 1: SE /4
<br />Sec. 12: lots 1, 2, 7, 8, 9, and 10
<br />Prior to this revision the Bowie No. 2 Mine permit contained 5,865 acres of land, 2,612 acres of private
<br />surface and 3,253 acres of Federal surface. Private minerals within the permit area encompassed
<br />1,957 acres with Federal minerals accounting for the balance of 3,908 acres.
<br />After this revision the Bowie No. 2 Mine permit will contain 8,301 acres of land, 4,637 acres of private
<br />surface and 3,664 acres of Federal surface. Private minerals will encompass 1,957 acres with Federal
<br />minerals accounting for the balance of 6,344 acres.
<br />A copy of the proposed revision is available for public inspection at the Paonia Public Library, 140
<br />Grand Avenue, Paonia, CO, and at the offices of the Division of Reclamation, Mining & Safety,
<br />1313 Sherman St., Room 215, Denver, CO, 80203, (303) 866 -3567. Written comments regarding
<br />this application may be submitted to and additional information may be obtained from the Division
<br />of Reclamation Mining & Safety at the above address. Written comments must be received by the
<br />- Division of- Reclamation, - Mining -& Safety within 10 days after the date -of this - publication in order to
<br />be considered.
<br />0
<br />PR - 12 2.03 - 22 02/10
<br />A PPR0VC -D
<br />!t1/ ,6 �I
<br />
|