My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-16_PERMIT FILE - C1982056A (5)
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2012-07-16_PERMIT FILE - C1982056A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:03:29 PM
Creation date
8/1/2012 8:29:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
7/16/2012
Doc Name
Pages 2.05-1 to 2.05-64
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rockdust Distribution System <br />Mine Communications System <br />Personnel First Aid and Safety Equipment <br />Personnel Carriers <br />Shield Roof Support Carriers <br />Supply Tractors and Trailers <br />Lubrication Trailers <br />Maintenance Equipment and Supplies <br />Front End Loaders <br />Haulage Trucks <br />Dozers <br />Motor Grader <br />Water Truck <br />Boom Truck and Fork Lifts <br />Utility Trucks and Light Vehicles <br />Air Compressor <br />Welders <br />Generators <br />Light - Plants <br />Pumps <br />EASTERN, NORTHERN, AND WESTERN MINING DISTRICT <br />The same mining methods utilized at the existing Foidel Creek Mine will be used to mine coal from the Eastern, <br />Northern and Western Mining Districts. The only significant differences will be longwall panel length and <br />width, i.e. approximately 10,000 - 20,000 feet in length compared with original panel length of approximately <br />10,000 feet, and 1,000 — 1,200 feet wide compared to the original panel width of approximately 640 feet. <br />is The existing surface facilities, including the bathhouse, offices, shop /warehouse, coal stockpiling and handling <br />systems, and coal loadout will continue to be used for mining coal from the Eastern, Northern and Western <br />Mining Districts. In order to support mining in the EMD and NMD, a dewatering facility (the 10 -Right <br />Dewatering Installation) was constructed, and five fans (Zero Entry, EMD Fan Installation (2 fans), NW Mains <br />Ventilation Fan, and 18 -Right Ventilation Fan) installed. The location of the new support systems are shown on <br />Map 23, Mine Plan, and Maps 17 and 17A and Maps 18 and 18A, Premine Soils and Premine Vegetation, <br />respectively, and these systems are described in greater detail in the following sections. In order to support <br />continuing and future mining in the NMD and WMD, a second dewatering borehole (10 -Right Borehole 2) was <br />developed, and three new shafts and associated support facilities (6MN and 18 -Left (2 shafts) Installations) were <br />completed. <br />EMD (Panels 2 Right through 6 Right, PR 97 -04) <br />The same mining methods utilized in the EMD will be used to extract the coal from the remainder of the EMD. <br />The existing surface facilities, including the EMD ventilation sites, will be used for mining of coal in the new <br />five -year permit area. Presently, no new surface facilities are planned in support of the mining that is to occur in <br />the remainder of the EMD. <br />NMD (Panels 12 Right through 16 Right, PR 99 -05) <br />The same mining method utilized in the EMD will be used to extract coal from the NMD, except that the face <br />width is increased to 1000 -foot. The existing surface facilities, including the EMD ventilation site, will be used <br />for mining of coal in the NMD permit area. <br />PR09 -08 2.05 -11 04/10/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.