Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 045 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one -way travel distance: <br />Average Travel Speed: <br />Total Non - Roadable Mob/Demob Cost * <br />`* two round trips with haul rig. <br />Total Roadable MoblDemob Cost ** <br />* * one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Nan - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.40 <br />0.40 <br />0.40 <br />0.40 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.80 <br />0.80 <br />Page 2 oft <br />HAYDEN <br />10.00 miles <br />25.00 mph <br />$3,533.70 <br />$44.41 <br />Total job time: 3,60 Hours <br />Total job cost: $3,578.11 <br />CIRCES Cost Estimating Software <br />