Laserfiche WebLink
EQUIPMENT MOB ILIZATIONIDEMOBILIZATION <br />Task description: AloblDemohilixatlon for Pond Remov <br />Site: Hoyden Gulch Loadout Permit Action: SLl <br />PROJECT IDENTIFICATION <br />Task #: 046 State: Colorado <br />Date: 6/18/2012 County: Routt <br />User: JLE <br />Agency or organization name; DRMS <br />E i]IPMENT TRANSPORT RIG COST <br />Page 1 of 2 <br />PermitfJob #: C1992081 <br />Abbreviation: None <br />Filename: C081 -046 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 1007) <br />Cost Breakdown; <br />Available Rig Capacities <br />0 -25 Tons <br />26-50 Tons <br />51f Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour- <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/flour: <br />1 $88.67 <br />1 $117.55 <br />1 $125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr/unit <br />Size <br />Costlhrl <br />Cost/hr/ fleet <br />COW fleet <br />(TONS) <br />fleet <br />Cat D I OT - 10SU <br />93.31 <br />$111.83 <br />$125.45 <br />1 <br />$23725 <br />$125.45 <br />$500.00 <br />Drill /Broadcast <br />25.00 <br />$39.59 <br />$88.67 <br />1 <br />$12826 <br />$88.67 <br />$250.00 <br />Seeder with Tractor <br />Power Mulcher <br />6.00 <br />$7.03 <br />$88.67 <br />1 <br />$95.70 <br />$88.67 <br />$250.00 <br />Reinco M90) <br />Subtotals: 1 $461.24 1 $302.79 1 $1,000.00 <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cvstlktrl unit <br />Fleet Size' <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Costlhrl fleet <br />Flatbed Truck, 6x4, 45K GV W <br />$55.51 <br />1 <br />$55.51 <br />$55.51 <br />Subtotals: $55.51 $55.51 <br />CIRCES Cost Estimating Software <br />