Laserfiche WebLink
July 25, 2012 C-1996-084/Lorencito Canyon Mine JHB <br /> <br /> <br /> <br />Repairs have also been made to the northwest slope of reclamation parcel W-6. This location has not been <br />mulched yet. Discussion with NECC personnel during the July 17, 2012 inspection indicated that all repairs other <br />than the Fill 8 repair will be hydroseeded and hydro-mulched during the Fall of 2012. Fill 8 was broadcast seeded <br />and straw mulched in July due to the inaccessibility of the 3rd bench area with hydro-seeding equipment. <br /> <br />Repairs to gullies on slopes in parcels N-2 and C-1 were visible in Photo 2. Material has been packed into the <br />gullies, and tracked. These areas have not been seeded or mulched yet. <br /> <br />Repairs the south facing slope in parcel W-1 have been conducted. This repair consists of packing material into <br />the gullies. This location has not been seeded or mulched yet. This slope drains to Pond 6. (photo 3). <br /> <br /> <br />DOCUMENTS RECEIVED NA <br />OTHER (SPECIFY) <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 0 <br /> <br />38 <br />Page of <br /> <br /> <br />