My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-24_REVISION - M2008060
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008060
>
2012-07-24_REVISION - M2008060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:25:43 PM
Creation date
7/24/2012 3:22:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008060
IBM Index Class Name
REVISION
Doc Date
7/24/2012
Doc Name
AM- 01 AMENDED EXHIBITS & PROOF OF PUBLICATION
From
HANSEN LAW
To
DRMS
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Species <br />PLS Rates <br />Irr/Non -Irr <br />PLS /Ac to use <br />(100 %) <br />% in <br />mix <br />Rate <br />(PLS lb /ac) <br />Total PLS <br />Western <br />wheatgrass <br />16.0/8/0 <br />16.0 <br />25 <br />4.0 <br />4.4 <br />Big bluestem <br />11.0/5.5 <br />11.0 <br />20 <br />2.2 <br />2.4 <br />Blue grama <br />3.0/1.5 <br />3.0 <br />20 <br />0.6 <br />0.7 <br />Sideoats grama <br />9.0/4.5 <br />9.0 <br />15 <br />1.4 <br />1.5 <br />Little bluestem <br />7.0/3.5 <br />7.0 <br />10 <br />0.7 <br />0.8 <br />Switchgrass <br />4.0/2.0 <br />4.0 <br />10 <br />0.4 <br />0.4 <br />EXHIBIT C - AMENDED <br />ATTACHED TO CONSTRUCTION MATERIALS LIMITED IMPACT (110) OPERATION <br />RECLAMATION PERMIT AMENDMENT APPLICATION (Rule 1.10) <br />OF CLG FARMS, LLC <br />MINING PLAN <br />There will be approximately one (1) foot of top soil removed and one (1) to two (2) feet of <br />overburden. They will both be stockpiled separately inside the west boundary of the permit. A <br />1 H:1 V slope will be maintained during the mining process on the side walls of the pit. The top <br />soil and overburden will be removed by a carry -all and stockpiled. The top soil stockpile will be <br />approximately 15 feet wide and 8 feet high. The top soil will be stacked in a manner so it can be <br />seeded with grass. The seed grass mixture will be as follows: <br />A protective bank will be left between the pit and Surveyor Creek. Surveyor Creek will be 50 <br />feet away from the mining pit. No mining will take place in Surveyor Creek. The flood <br />elevation of Surveyor Creek during a ten (10) year, 24 hour storm is probably 5 to 6 feet and <br />should never get close to the mining area. The elevation difference between the channel of <br />Surveyor Creek and the eastern edge of the proposed pit is 10 -12 feet. Flood water will be <br />returned to the waterway using 3 pumps to extract the water from the pit and pumped back into <br />the waterway. <br />See also Exhibit C to original Application signed and dated August 14, 2008, Permit # M -2008- <br />060. <br />
The URL can be used to link to this page
Your browser does not support the video tag.