Laserfiche WebLink
<br />electrical distribution center, and the water and sewage treatment <br />facility. All of the various primary facilities, such as the • <br />preparationldewatering systems (water pumping, coal sizing, <br />dewatering, and crushing) will be enclosed within a single modular <br />steel, painted building not to e~:ceed 100' x 50' The building and <br />modular components will be fab-icated off-site and will be erected <br />upon assembly of the components to be housed within the building. <br />The auxiliary facilities, except the electrical substation and <br />water and sewage holding areas, will be located in a second similar <br />painted steel building (Butler type) which will be 50' r. 80'. <br />9.3.3.1 Primary Facilities (Figure 4.2-3) <br />9.3.3.1.1 Pumping and Sizing <br />This facility handles the produced coal as it leaves the mine flume <br />system as a slurry. The coal Yias been initially sized through the <br />use of a conventional feeder-breaker underground to a maximum size <br />of 7 inches. The slurry wl~.ich is being transported from the <br />production face to the surface, is transported through an open • <br />flume system or a large diameter polyethylene pipe. From the <br />portal to the processing building, the coal will move through an <br />enclosed 30-inch (approximate) pipe. This will allow for travel <br />across the portal road as well .3s eliminating any spillage onto the <br />ground. <br />The dewatering plant (within the process building) has been <br />designed for the development operation as a closed loop. This <br />design may be retained during full operation as more information <br />regarding the coal and wall rock is obtained. The closed loop <br />design does not generate any coal wastes (Exhibit 4.3-3) All <br />solids entering the plant will go to any of the two coal storage <br />piles, and any effluent water recovered from the sieves, <br />centrifuges, belt press (filter), or static thickener, will be <br />recycled into the mine production system. All dewatering will be <br />NCIG - Coal Ridge #1 <br />4-22 ABC/1145/910509 • <br />