Laserfiche WebLink
4.3.2.2 Personnel Requirements <br />• The proposed operation by NCIG will reach full employment by the <br />third year of operation, assuming production is maintained at 1 <br />million tons per. year. Table 4.3-2 summarizes t)~e personnel <br />reyuileinent for the permit period. <br />Table 4.3-2. Personnel Requirements for the 5-Year Permit Period <br />Year No. of People Required <br />1 35 <br />2 50-75 <br />~ 100-125 <br />4 125 <br />5 125 <br />9.3.2.3 Power Requirements <br />Electrical power will be supplied by the Public Service Company of <br />Colorado. Power at 25,000 volts will be reduced to 9160 volts for <br />• general mine distribution, 490 volts for motors, and 220/110 volts <br />for offices and other miscellaneous use. Connected load totals <br />12,720 kilowatts (kw), peaking maximum load is 8700 kw, and average <br />monthly consumption is estimated at 9,000,000 kilowatt-hours (kwh). <br />As produc~ion iccreases to 2,500,000 tpy, after ;e:;~ __~.~a, <br />connected load will total 17,220 kw, peaking maximum load will be <br />10,700 kw, and average monthly consumption will reach 6,000,000 <br />kwh. <br />9.3.3 Surface Facilities <br />The primary surface facilities include the pumping and sizing <br />facility for water handling, coal sizing, and water clarification; <br />the crusher for further breaking down of the coal; the coal <br />dewatering plant for coal; and temporary coal storage. Auxiliary <br />facilities include the offices, changehouse, warehouse, shops, <br />• NCIG - Coal Ridge #1 4-21 ABC/1145/910509 <br />T2-~ <br />