Laserfiche WebLink
1111111111111111111 <br /> 999 / <br /> v <br /> M - 14( 77- 378 <br /> SUNNYSIDE GOLD CORPORATION <br /> AN ECHO 13AY COMPANY <br /> P.O. Box 177 .Silverton, CO 81433 <br /> Phone (303) 387-5533 .Telecopy (303) 387-5310 <br /> July 22, 1991 - <br /> RECEIVED <br /> Ms. Sarah Johnson JUL xT go <br /> CDPHE - Assessment Unit <br /> Water Quality Control Division DIV. OF MINERALS <br /> 4300 Cherry Creek Drive South 8 GEOLOGY <br /> Mail Code: WQCD-AU-B2 <br /> Denver, CO 80246-1530 <br /> RE: June 1998 Monthly Report, 2nd Quarter Report, nd DMRs for CDPS <br /> Permit No. CO �7b - ine Remediation Projects, San Juan County <br /> Dear Ms. Johnson: <br /> The following is submitted to satisfy the 2nd Quarter, June <br /> monthly, and DMR reporting requirements for CDPS Permit No. CO- <br /> 0044768 - Mine Remediation Projects and the related Consent Decree <br /> agreement. <br /> Project Status: <br /> "A List" Projects <br /> - American Tunnel Mine Waste Dump <br /> - Boulder Creek Tailings Project <br /> - Surface Mill Tailings at Eureka <br /> - Gold Prince - Mill Tailings <br /> - Ransom Tunnel <br /> - Longfellow - Koehler Mine Waste Project <br /> - Pride of the West Tailings <br /> These projects were completed and accepted by DMG as complying with <br /> the Consent Decree work plans and MLR Standards in 1997. <br /> Monitoring and maintenance is the only additional work planned for <br /> these sites. <br /> In June, 1998 monitoring samples were taken at the Longfellow - <br /> Koehler project site. The results from these samples had not been <br /> received by the date of this report and will be submitted with the <br /> July report. Included with this report are the May sample results <br /> from the Koehler discharge and the down gradient monitoring <br /> station. All monitoring sites were not accessible during this <br /> sample event but in June all monitoring sites were sampled. <br />