August 1997 Monthly Report <br /> Page 2 <br /> arrangement for access is planned until it becomes evident <br /> that the work plan for this project requires implementation. <br /> - Surface Mill Tailings at Eureka <br /> This project was completed in July, 1997 and inspected by DMG <br /> in August. According to the inspection report, DMG agrees that <br /> this project has been completed according to the Consent <br /> Decree work plan and MLR standards. <br /> - Gold Prince - Mill Tailings <br /> Mobilization for this project occurred in late July. The <br /> portal seal and preparation of the consolidation site were <br /> completed in August. An additional access agreement was <br /> obtained from the owner of the land upon which tailings pile <br /> T-3 is located and a Land Use Permit was obtained from the BLM <br /> to implement the portion of the work plan affecting public <br /> lands (i.e. removal of waste dump W-2 and use of a portion of <br /> the consolidation area) . The need for these agreements became <br /> apparent after site surveys were completed for implementation <br /> of the work plan. <br /> Preparation of the consolidation site consisted of stripping <br /> topsoil and overburden and stockpiling for later use to <br /> cap the consolidated waste piles and as required for plant <br /> media in the areas where mine waste or tailings removal was <br /> planned. An underdrain was placed in the consolidation area to <br /> allow seepage that may exist in this area to pass under the <br /> mine waste without contacting the mine waste. <br /> A tailings containment was constructed with material from mine <br /> waste pile W-2 in the dump expansion or consolidation area. <br /> This containment was lined with geotextile and 40 mil PVC <br /> liner. Tailings and ashes from tailings piles T-1, T-2 , and T- <br /> 3 were in the process of being collected at month end for <br /> placement in this lined containment. <br /> Planned activity for September includes completion of; <br /> placement of tailings and ashes in this lined containment <br /> area. <br /> placement of the capping liner over this containment. <br /> consolidation of waste piles W-1, W-2 , W-3 , W-4, W-5, and W-6 <br /> over and around the lined containment. <br /> completion of the upland diversion ditch and County Road <br /> realignment. <br /> placement of neutralization material. <br /> capping of the consolidated pile with overburden. <br /> seeding, fertilizing, and mulching of the areas disturbed by <br /> the waste consolidation work. <br /> Site monitoring results for July are attached. <br />