Laserfiche WebLink
July 1997 Monthly Report <br /> Page 4 <br /> The water pool pH at the American Tunnel bulkhead on July 23 , <br /> 1997 was 4 . 72 and the bulkhead pressure was 307 psi. This <br /> observed pH rise occurred prior to the start of alkaline <br /> injection. <br /> - Cement Creek Diversion and Water Treatment <br /> Cement Creek diversion and water treatment was active <br /> continuously throughout July. Due to Cement Creek flow <br /> quantities, diverted flows for water treatment from Cement <br /> Creek were controlled throughout July. These treated flows <br /> ranged from 1139 GPM to 1223 GPM. <br /> Results for June monitoring samples of Cement Creek diverted <br /> for treatment (CC-1B) ; American Tunnel flow before treatment <br /> (AT-INFEL) ; dissolved metals analysis of the AT-004 discharge; <br /> and Cement Creek below the AT-004 discharge point (CC-20) are <br /> attached. July results were not received by the date of this <br /> report and will be submitted with the August report. <br /> - Mainstem Stream Monitoring and Reference Point Stream <br /> Monitoring <br /> Sunnyside sampled the reference point (A-72) on July 9 , 1997 . <br /> The other three gaging stations were sampled by the BOR. The <br /> provisional flow from the outside gage at A-72 for the July 9, <br /> 1997 sample was 705 cfs which is in the high flow <br /> category (Q > 300 cfs) . <br /> The reported dissolved zinc value is 244 ug/l which is the <br /> average of results from two labs. <br /> The BOR July 9 , 1997 sample results for the gaging stations <br /> were 330 ug/l for A-68 , 95 ug/1 for M-34 and 680 ug/1 for C- <br /> 48 . <br /> All sub-basins and the reference point A-72 appear to have <br /> been at or below average zinc concentrations in July. Flows <br /> at A-72 have been adjusted for April, 1997 through June, 1997 <br /> based on input from the USGS who operate the gage. These <br /> adjustments did not cause a flow class change for any of these <br /> previously reported months. <br /> The index number for the July sample is calculated as follows: <br /> Xi = 244 <br /> Xf = 306 <br /> Sf = 104 <br /> Ni = (Xi-Xf) /Sf <br /> Ni = (244-306)/104 <br /> Ni = -0. 60 <br />