July 1997 Monthly Report <br /> Page 3 <br /> Preliminary results, from the bench test treated water <br /> analysis, indicate that the system works well but there is <br /> concern about the useful life of the system. Predictions of <br /> useful life may be available in August. <br /> The discharge from the Koehler adit increases by a factor of <br /> 10 with spring flows but it appears that the loading remains <br /> constant. This indicates a fresh water inflow exists but <br /> Sunnyside has not been able to find any indication that this <br /> inflow originates on surface where it could be diverted. <br /> Mobilization for project completion is planned for late <br /> August. <br /> - London Mine Portals - Waste Dumps <br /> This is a "B List" project. Therefore, no work, permitting or <br /> arrangement for access is planned until it becomes evident <br /> that the work plan for this project requires implementation. <br /> - Pride of the West Tailings <br /> This project was active throughout the month of July. By July <br /> 31, a total of 52 , 450 cubic yards were excavated and hauled to <br /> the on-site tailings pond (42 , 030 cubic yards) or to <br /> Sunnyside' s Tailings Pond No. 4 (10,420 cubic yards) . A total <br /> of 323 . 5 tons of alkaline material (quick-lime kiln dust) was <br /> purchased through July 31 to add to the excavated tailings <br /> upon placement in the on-site tailings pond or Tailings Pond <br /> #4 . <br /> Recommendations for final slope construction configuration <br /> were received from Western Technologies. This included <br /> •excavation of silty clay material to a 2 : 1 slope, placement of <br /> slope and bottom drainage, and rebuild to a 4 : 1 slope with <br /> sand material . This configuration should provide a stable <br /> slope under static or earthquake loading conditions. <br /> Planned activity for August includes final slope excavation <br /> and reconstruction. <br /> - Sunnyside Mine Pool Mitigation - Alkaline Solution Injection <br /> This project was started at the end of July. By July 31, a <br /> total of 14 tons of hydrated lime had been added to the mine <br /> pool through the Sunnyside Basin injection site. Water <br /> injection started on July 14 , 1997 . Through July 31, 1997 , a <br /> total of 1. 4 MG was injected. <br /> The main purpose of this water injection is to keep the <br /> alkaline material injection pipe clean although it will also <br /> serve to speed the establishment of mine pool physical <br /> equilibrium. <br />