My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-25_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1997-07-25_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2021 8:25:02 AM
Creation date
7/18/2012 7:33:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
7/25/1997
Doc Name
June, 1997 Monthly/ 2nd Quarter Report
From
Sunnyside Gold Corp
To
CDPHE-WQCD
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a j ' <br /> June 1997 Monthly Report <br /> Page 4 <br /> Planned activity for July is excavation to natural ground in <br /> the main portion of the historic tailings pond. This will <br /> require excavation below or at the water table which will <br /> require site dewatering. Sources of gravel material similar <br /> to the site material are being investigated for potential <br /> borrow to fill areas during final contour establishment where <br /> the water table is exposed during excavation. <br /> - Sunnyside Mine Pool Mitigation - Alkaline Solution Injection <br /> During the month of June, this project was inactive with no <br /> alkaline material or water being injected. <br /> The water pool pH at the American Tunnel bulkhead on June 30, <br /> 1997 was 3 .49 and the bulkhead pressure was 301 psi. Sunnyside <br /> will continue to monitor these parameters. <br /> Start of alkaline material injection into the mine pool for <br /> the 1997 construction season is tentatively planned for late <br /> July. <br /> - Cement Creek Diversion and Water Treatment <br /> Cement Creek diversion and water treatment was active <br /> continuously throughout June. Due to Cement Creek flow <br /> quantities, diverted flows for water treatment from Cement <br /> Creek were controlled throughout June. These treated flows <br /> ranged from 1049 GPM to 1118 GPM. <br /> Results for June monitoring samples of Cement Creek diverted <br /> for treatment (CC-1B) ; American Tunnel flow before treatment <br /> (AT-INFEL) ; dissolved metals analysis of the AT-004 discharge; <br /> and Cement Creek below the AT-004 discharge point (CC-20) had <br /> not been received by the date of this report and will be <br /> reported in the July report. Attached are dissolved metals <br /> analysis of the AT-004 discharge for June. <br /> - Tailings Pond No. 4 <br /> Progress pictures of the deposition area on Tailings Pond No. <br /> 4 are included with this report. <br /> - Mainstem Stream Monitoring and Reference Point Stream <br /> Monitoring <br /> Sunnyside sampled the reference point (A-72) , and the other <br /> three gaging stations; Cement Creek (C-48) , Mineral Creek (M- <br />
The URL can be used to link to this page
Your browser does not support the video tag.