Laserfiche WebLink
Page 2 of 5 <br />Pawnee Aggregate Pit <br />Adequacy Review <br />6.4 SPECIFIC EXHIBIT REQUIREMENTS — REGULAR 112 OPERATIONS <br />The following items must be addressed by the Applicant in order to satisfy the requirements of <br />C.R.S. 34- 32.5 -101 et seg. and the Mineral Rules and Regulations of the Mined Land <br />Reclamation Board: <br />6.4.3 Exhibit C - Pre - Mining and Mining Plan Maps of Affected Land <br />4. Rule 6.2.1(2) requires maps be signed by a registered land surveyor, professional engineer, or <br />other qualified person. The maps submitted to the Division were not signed. Please resubmit <br />signed copies of the maps. <br />5. The copy of Exhibit C — Pre - Mining Plan Map submitted by the Applicant in the permit <br />application did not indicate the following noticed land, structure and easement owners. Please <br />revise Exhibit C to indicate the following owners: <br />a. Industrial Federal Savings and Loan <br />b. Cory Shull <br />c. Black Hawk Royalty II LP <br />d. Marr LLC <br />e. Gerald Lee Roth <br />f. GFL & Associates, LLC <br />g. MAP Royalty Inc. <br />h. EOG Resources Inc. <br />6. The following land, structure and easement owners noted on the Exhibit C - Pre - Mining and <br />Mining Plan Map did not indicate the owner's information or address. Please provide the <br />names of the owners or contact information for the following: <br />a. Power pole and easement owner <br />b. Sligo Cemetery <br />c. United States of America <br />6.4.4 Exhibit D - Mining Plan <br />7. The Applicant states in Methods of Mining section, gravel extraction and processing will be <br />seasonal. Please confirm the applicant intends to operate the site continuously or if the Division <br />should consider the site an "intermittent operation" as defined in C.R.S 34- 32.5- 103(11)(b). <br />8. Please revise the first paragraph of the Method of Mining section of the Mining Plan to <br />reference "Colorado Division of Reclamation, Mining and Safety" in place of "Colorado Division <br />of Mining and Geology ". <br />9. In the Size of Area to be Worked section the Applicant states, the mining area is split into 4 cells. <br />Please provide the size of each cell and an estimate for the time required for each cell to be <br />mined. Please update Exhibit C — Mining Map accordingly. <br />