Laserfiche WebLink
Peabody Sage Creek Mine — Drainage and Sediment Control Plan <br />5. Anchor full - length, margins of blankets at top of side slopes with a row of staples /stakes. <br />Backfill soil material over final 12- inches of blanket margin and compact. <br />TR -01 2.05.3 -E2.21 Revised 04/12 <br />4 <br />