My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-08_PERMIT FILE - C2009087A (12)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087A
>
2012-06-08_PERMIT FILE - C2009087A (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:59:40 PM
Creation date
7/12/2012 3:18:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087A
IBM Index Class Name
Permit File
Doc Date
6/8/2012
Doc Name
DRAINAGE AND SEDIMENT CONTROL PLAN
Section_Exhibit Name
Exhibit 2.05.3-E2 Drainage and Sediment Control Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peabody Sage Creek Mine - Drainage and Sediment Control plan <br />TABLE 2.05.3 -E2 -7 <br />Postmine Channel Design Schedule <br />(cont d) <br />Seneca II Mine <br />Postmine <br />Slope <br />Bottom <br />Side <br />Design <br />Ditch <br />Design Flow <br />Design Flow <br />( %) <br />Width <br />Slope <br />Velocity <br />Flow Depth <br />Design Depth <br />Lining Type ''8'9 <br />cfs 1'Z <br />cfs 3 <br />11 <br />H:1 <br />(fps) 4 <br />ft 5 <br />ft 6 <br />PM -17 <br />1.0 <br />1.0 <br />2-8 <br />2 <br />3 <br />1.6 <br />0.8 <br />1.1 <br />Vegetated <br />9-13 <br />3.8 <br />0.2 <br />0.7 <br />Gravel <br />PM -18 <br />1.0 <br />1.0 <br />8-20 <br />2 <br />3 <br />4.4 <br />0.2 <br />0.5 <br />Gravel <br />PM -19 <br />1.0 <br />1.0 <br />9-21 <br />V -ditch <br />3 <br />1.4 <br />0.7 <br />1.0 <br />Vegetated <br />PM -20 <br />36 <br />1.0 <br />11-22 <br />2 <br />3 <br />8.9 <br />1.0 <br />1.3 <br />D5o = 9" <br />23-27 <br />9.1 <br />0.9 <br />1.2 <br />D50 = 12" <br />PM -21 <br />1.0 <br />1.0 <br />4-22 <br />V -ditch <br />3 <br />2.8 <br />0.9 <br />1.2 <br />Vegetated <br />PM -22 <br />1.0 <br />1.0 <br />10-14 <br />2 <br />3 <br />3.9 <br />0.1 <br />0.4 <br />Gravel <br />PM -23 <br />1.0 <br />1.0 <br />7-20 <br />V -ditch <br />3 <br />1.4 <br />0.8 <br />1.1 <br />Vegetated <br />SCM -1 <br />n/a <br />60.4 <br />5.7-30 <br />10 <br />3 <br />8.7 <br />0.8 <br />1.1 <br />D50 = 9" <br />SCM -2 <br />n/a <br />34.2 <br />2.0-4.0 <br />10 <br />3 <br />4.5 <br />1.3 <br />1.6 <br />Vegetated <br />SCM -3 <br />n/a <br />1.8 <br />0.5-5.5 <br />1 <br />3 <br />2.0 <br />1.5 <br />1.8 <br />Vegetated <br />SCM -4 <br />n/a <br />1.9 <br />5.0-26 <br />3 <br />3 <br />2.9 <br />0.6 <br />0.9 <br />Vegetated <br />SCM -5 <br />n/a <br />1.0 <br />1.0 - 13 <br />3 <br />3 <br />1.7 <br />0.9 <br />1.2 <br />Vegetated <br />RA-1-131 <br />n/a <br />1.0 <br />0.6 <br />1 <br />3 <br />0.6 <br />1.2 <br />1.5 <br />Vegetated <br />R13-131 <br />n/a <br />2.0 <br />0.5-3.0 <br />V -ditch <br />3 <br />1.6 <br />1.7 <br />2.0 <br />Vegetated <br />RE -Dl <br />n/a <br />1.0 <br />0.5 <br />V -ditch <br />3 <br />0.6 <br />1.4 <br />1.7 <br />Vegetated <br />Notes: 1) Seneca II Mine Design Flow from Seneca II Mine Permit, C- 1980 -005, Tab 3, Appendix 7 -12, Postmining Drainage Control. <br />2) Design flow from SEDCAD4 modeling; minimum deign flow = 1.0 cfs. <br />3) Postmine design flows for PM -1, SCM -1 and SCM -2 use the 100 -year, 24 -hour storm event (Rule 4.05.4); all other <br />channels designed for the 10 -year, 24 -hour storm event <br />(Rule 4.05.3). <br />4) Design velocity based on maximum grade (using Retardance Class D for vegetated channels). <br />5) Flow depth based on minimum grade (using Retardance Class B for vegetated channels, unless otherwise <br />noted). <br />6) Design Depth = flow depth plus freeboard (0.3 feet). <br />7) Rock riprap sized using PADER Method; design DS0 = SEDCAD value plus three (3) inches, unless otherwise noted. <br />8) Riprap D50= 3- inches represents typical gravel found on -site. <br />9) Gravel Lining represents 3 -inch minus material. <br />10) PM -3U is the ditch reach down to the confluence with PM -19. <br />11) PM -3M is the ditch reach from the confluence with PM -19 to Stock Tank T33. <br />12) PM -3L is the ditch reach from T33 to the ditch outlet. <br />13) PM -4U is above Stock Tank T28. <br />14) PM -4M is the ditch reach from T28 to the confluence with PM -16. <br />15) PM -4L is the ditch reach from PM -16 to the confluence with PM -6. <br />16) PM -6U is the ditch reach above PM -6b. <br />17) PM -6M is the ditch reach from the confluence with PM -6b to where PM -7 joins the ditch. <br />18) PM -6MM is the ditch reach from PM -7 to where PM -20 joins the ditch. <br />TR -0)r- 2.05.3 -E2.17 Revised 04/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.