Laserfiche WebLink
Peabody Sage Creek Mine - Drainage and Sediment Control Plan <br />TABLE 2.05.3 -E2 -6 <br />North Facilities Area (Shop/Warehouse Area) Diversion Ditch Design Schedule <br />These designs are both Operational and Postmine Designs) <br />Design <br />Ditch <br />Design Flow <br />Slope <br />Bottom Width <br />Side Slope <br />Velocity <br />Flow Depth <br />Freeboard <br />Design Depth <br />Lining Type 4) <br />cfs ) <br />(ft) <br />H:IV) <br />(f s Z) <br />ft s) <br />ft <br />ft <br />Northwest <br />40.4 <br />0.05 ft/ft <br />15 <br />2 <br />5.1 <br />0.5 <br />0.5 <br />1.0 <br />Riprap as <br />Diversion Ditch <br />required <br />Shop Diversion <br />22.1 <br />1.0% <br />V -ditch <br />2 <br />4.9 <br />1.5 <br />0.5 <br />2.0 <br />Vegetated <br />Ditch <br />PreLaw Diversion <br />1.25 <br />4.0% <br />5 <br />3 <br />0.5 <br />0.4 <br />0.3 <br />0.7 <br />Vegetated <br />Ditch <br />Old Boneyard <br />23 <br />4.0 <br />3 <br />2 <br />1.1 <br />0.8 <br />0.3 <br />1.1 <br />Vegetated <br />Diversion Ditch <br />Office Diversion <br />1.5 <br />33 <br />V -ditch <br />3 <br />0.7 <br />1.0 <br />0.3 <br />13 <br />Vegetated <br />Ditch <br />10 <br />10 <br />2.3 <br />0.1 <br />0.4 <br />D50= 3" <br />Ditch RA -D1 <br />1.00 <br />0.4-7 <br />V -ditch <br />3 <br />1.7 <br />1.5 <br />0.3 <br />1.8 <br />Vegetated <br />Notes: 1) Channel designed to safely convey runoff from the 10 -year, 24 -hour storm event <br />2) Design velocity for vegetated channels based on Stability Class C; except where noted <br />3) Flow Depth for vegetated channels based on Capacity Class B; except where noted <br />4) Rock riprap sized using Simons /OSM Method <br />5) Ditch RA -D1 design velocity based on Ca acit Class D <br />TR -03 2.05.3 -G2.14 Revised 04/12 <br />