My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-01-22_REPORT - M1977378
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
1997-01-22_REPORT - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 7:53:57 AM
Creation date
7/3/2012 7:19:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REPORT
Doc Date
1/22/1997
Doc Name
December 1996 Monthly/4th Qtr Rpt and DMR's
From
Sunnyside Gold Corp
To
CDPHE-WQCD
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 1996 Monthly/4th Quarter Report <br /> Page 3 <br /> Pride of the West Tailings <br /> Status of this site has not changed from the November monthly <br /> report. <br /> A County Land Use Permit has been granted to implement this <br /> project and a Section 404 Permit has been applied for. <br /> Although an access agreement has been obtained for the land <br /> containing the bulk of the project, DMG approval has not been <br /> obtained by the owner/operator of the site. Their approval is <br /> contingent on receipt of acceptable test results on tailings <br /> pond permeability where the historic tailings are to be placed <br /> onsite. The test work has been done but due to disagreements <br /> between sellers, owners and operator, the report has not been <br /> completed or submitted to DMG for consolidation site approval. <br /> Sunnyside will continue to request that this submittal be <br /> completed so the project can proceed as planned during the <br /> 1997 construction season. <br /> Bordering landowners have not answered Sunnyside's request for <br /> access grants to remove tailings that have migrated onto their <br /> property from the project area. Since this is such a minor <br /> portion of the project, Sunnyside will proceed with the main <br /> project area whether these bordering areas can be accessed or <br /> not pending receipt from DMG of consolidation site approval. <br /> - Sunnyside Mine Pool Mitigation - Alkaline Solution Injection <br /> During the month of December, this project was inactive with <br /> no alkaline material or water being injected. <br /> The water pool pH at the American Tunnel bulkhead on December <br /> 30, 1996 was 5.48 and the bulkhead pressure was 231 psi. <br /> Sunnyside will continue to monitor these parameters through <br /> the winter. <br /> - Cement Creek Diversion and Water Treatment <br /> Cement Creek diversion and water treatment was active <br /> continuously through December. The entire flow of Cement <br /> Creek was diverted and treated along with the portal flow <br /> from the American Tunnel. <br /> Attached are results from flow and quality monitoring of; <br /> Cement Creek diverted for treatment (CC-1B) ; American Tunnel <br /> flow before treatment (AT-INFEL) ; dissolved metals analysis of <br /> the AT-004 discharge; and Cement Creek below the AT-004 <br /> discharge point (CC-20) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.