Laserfiche WebLink
December 1996 Monthly/4th Quarter Report <br /> Page 2 <br /> - Columbus Mine Portals - Mine Waste Dumps <br /> Status of this site has not changed from the November monthly <br /> or 3rd quarter reports. <br /> - Surface Mill Tailings at Eureka <br /> No work was done on this project in December and due to snow- <br /> cover no progress pictures were taken. <br /> The project was completed in November other than some minor <br /> grading that might be required after inspection in the spring. <br /> - Gold Prince - Mill Tailings <br /> This site has been inaccessible since October therefore, no <br /> site work was done and no project pictures were taken. The <br /> work plan was amended in December and this permit amendment <br /> will become effective in February, 1997. Implementation of <br /> this amended work plan is planned for the 1997 construction <br /> season. <br /> The County Land Use Permit for this project has been received <br /> and all permitting is in place for project implementation. <br /> - Longfellow - Koehler Mine Waste Project <br /> During the month of December, an additional 9639 cubic yards <br /> were excavated and hauled from the Koehler waste dump to <br /> Sunnyside Gold Corporation's Tailings Pond #4. This brings <br /> the total yardage removed from this dump for the quarter to <br /> 15,000. The Koehler dump removal has been the focus of <br /> activity at this site during November and December. Progress <br /> pictures taken in December of this area are attached. <br /> Results from the November site samples are attached. <br /> Planned activity for the 1st Quarter of 1997 is to continue <br /> removing the Koehler dump as weather conditions allow. <br /> - London Mine Portals - Waste Dumps <br /> Status of this site has not changed from the November <br /> monthly/3rd quarter reports. <br />