My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-01-22_REPORT - M1977378
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
1997-01-22_REPORT - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 7:53:57 AM
Creation date
7/3/2012 7:19:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REPORT
Doc Date
1/22/1997
Doc Name
December 1996 Monthly/4th Qtr Rpt and DMR's
From
Sunnyside Gold Corp
To
CDPHE-WQCD
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 1996 Monthly/4th Quarter Report <br /> Page 2 <br /> - Columbus Mine Portals - Mine Waste Dumps <br /> Status of this site has not changed from the November monthly <br /> or 3rd quarter reports. <br /> - Surface Mill Tailings at Eureka <br /> No work was done on this project in December and due to snow- <br /> cover no progress pictures were taken. <br /> The project was completed in November other than some minor <br /> grading that might be required after inspection in the spring. <br /> - Gold Prince - Mill Tailings <br /> This site has been inaccessible since October therefore, no <br /> site work was done and no project pictures were taken. The <br /> work plan was amended in December and this permit amendment <br /> will become effective in February, 1997. Implementation of <br /> this amended work plan is planned for the 1997 construction <br /> season. <br /> The County Land Use Permit for this project has been received <br /> and all permitting is in place for project implementation. <br /> - Longfellow - Koehler Mine Waste Project <br /> During the month of December, an additional 9639 cubic yards <br /> were excavated and hauled from the Koehler waste dump to <br /> Sunnyside Gold Corporation's Tailings Pond #4. This brings <br /> the total yardage removed from this dump for the quarter to <br /> 15,000. The Koehler dump removal has been the focus of <br /> activity at this site during November and December. Progress <br /> pictures taken in December of this area are attached. <br /> Results from the November site samples are attached. <br /> Planned activity for the 1st Quarter of 1997 is to continue <br /> removing the Koehler dump as weather conditions allow. <br /> - London Mine Portals - Waste Dumps <br /> Status of this site has not changed from the November <br /> monthly/3rd quarter reports. <br />
The URL can be used to link to this page
Your browser does not support the video tag.