My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-12-20_REPORT - M1977378
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
1996-12-20_REPORT - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2021 2:49:05 PM
Creation date
7/3/2012 7:19:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REPORT
Doc Date
12/20/1996
Doc Name
November 1996 Monthly Report and DMR's
From
Sunnyside Gold Corp
To
CDPHE-WQCD
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 1996 Monthly Report <br /> Page 2 <br /> Surface Mill Tailings at Eureka <br /> During November, all equipment was demobilized from the site <br /> for the 1996 construction season. All temporary culverts <br /> installed and stream crossings constructed to facilitate <br /> access to the material to be removed from the site were <br /> removed as required by the Section 404 site permit. <br /> The project was basicly complete at the time of demobilization <br /> although some minor grading might be required after inspection <br /> in the spring when the snow cover is gone. <br /> Gold Prince - Mill Tailings <br /> Status of this project has not changed from the October <br /> monthly report. <br /> Longfellow - Koehler Mine Waste Project <br /> During the month of November, a total of 5361 cubic yards were <br /> excavated and hauled from the Koehler waste dump to Sunnyside <br /> Gold Corporation's Tailings Pond #4. A stockpile was <br /> accumulated on Tailings Pond #4 consisting of 161.8 tons of <br /> quicklime kiln dust to neutralize the dump material as it is <br /> consolidated into Tailings Pond #4. Bench tests indicate that <br /> approximately 1 tons of quicklime kiln dust will be required <br /> to neutralize 142 tons of dump material . <br /> Site contour maps were received from the October air photo <br /> flight. They were plotted as 80 scale plan maps with 4 foot <br /> contour intervals. These maps will be used for site planning. <br /> Additional site samples were taken on November 21, 1996. All <br /> sample sites could not be taken because of deep snowcover. <br /> Results from these samples have not been received and will be <br /> included in the December report. <br /> London Mine Portals - Waste Dumps <br /> Status of this site has not changed from the October monthly <br /> report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.