Laserfiche WebLink
November 1996 Monthly Report <br /> Page 2 <br /> Surface Mill Tailings at Eureka <br /> During November, all equipment was demobilized from the site <br /> for the 1996 construction season. All temporary culverts <br /> installed and stream crossings constructed to facilitate <br /> access to the material to be removed from the site were <br /> removed as required by the Section 404 site permit. <br /> The project was basicly complete at the time of demobilization <br /> although some minor grading might be required after inspection <br /> in the spring when the snow cover is gone. <br /> Gold Prince - Mill Tailings <br /> Status of this project has not changed from the October <br /> monthly report. <br /> Longfellow - Koehler Mine Waste Project <br /> During the month of November, a total of 5361 cubic yards were <br /> excavated and hauled from the Koehler waste dump to Sunnyside <br /> Gold Corporation's Tailings Pond #4. A stockpile was <br /> accumulated on Tailings Pond #4 consisting of 161.8 tons of <br /> quicklime kiln dust to neutralize the dump material as it is <br /> consolidated into Tailings Pond #4. Bench tests indicate that <br /> approximately 1 tons of quicklime kiln dust will be required <br /> to neutralize 142 tons of dump material . <br /> Site contour maps were received from the October air photo <br /> flight. They were plotted as 80 scale plan maps with 4 foot <br /> contour intervals. These maps will be used for site planning. <br /> Additional site samples were taken on November 21, 1996. All <br /> sample sites could not be taken because of deep snowcover. <br /> Results from these samples have not been received and will be <br /> included in the December report. <br /> London Mine Portals - Waste Dumps <br /> Status of this site has not changed from the October monthly <br /> report. <br />