My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-08-27_REPORT - M1977378
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
1996-08-27_REPORT - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 12:04:21 PM
Creation date
7/3/2012 7:19:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REPORT
Doc Date
8/27/1996
Doc Name
July 1996 Monthly Report and DMR's
From
Sunnyside Gold Corp
To
CDPHE-WQCD
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 1996 Monthly Report <br /> Page 4 <br /> Pride of the West Tailings <br /> No progress has been made towards permitting or gaining access <br /> approvals to implement the work plan at this site. <br /> Sunnyside Mine Pool Mitigation - Alkaline Solution Injection <br /> Implementation of this project was started on July 18, 1996 <br /> with equipment testing taking place on July 17, 1996. Through <br /> the end of the month the following approximate quantities of <br /> water and lime were pumped through the bulkhead. <br /> Water - 11 .95 million gallons <br /> Dissolved Hydrated Lime - 87 . 2 tons <br /> Total Hydrated Lime - 197 . 5 tons <br /> During this same time period, a total of 11. 53 million gallons <br /> was released at the American Tunnel bulkhead to evaluate the <br /> transport and mixing of the alkaline material within the mine. <br /> Cement Creek Diversion and Water Treatment <br /> This project was operational at month end but actual water <br /> treatment of Cement Creek water did not start by month's end. <br /> The American Tunnel bulkhead valve was temporarily closed on <br /> July 29 , 1996 in a valve closing ceremony but was later <br /> reopened to allow the evaluation of the alkaline injection <br /> project to proceed. <br /> Mainstem Stream Monitoring and Reference Point Stream <br /> Monitoring <br /> The reference point sample A-72 was taken on July 16, 1996. <br /> Mainstream samples at the other three gaging stations were <br /> taken by the Bureau of Reclamation. <br /> Based on provisional flow measurements, the flow at the <br /> reference point A-72 during the July 16, 1996 sampling session <br /> was 120 cfs. This will put the result in the intermediate <br /> flow category (100 cfs < Q < 300cfs) . The reported dissolved <br /> zinc value was 330 ug/l . <br />
The URL can be used to link to this page
Your browser does not support the video tag.