My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-07-05_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1996-07-05_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 1:45:26 PM
Creation date
7/3/2012 7:19:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
7/5/1996
Doc Name
Commitment No. 3
From
Sunnyside Gold Corp
To
DMG
Type & Sequence
TR14
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
American Tunnel Bulkhead Costs <br /> Page 4 <br /> STRIP FORMS, MOVE EQUIPMENT AND GROUT AND REGROUT BULKHEAD: <br /> (5 men - 4 days + 3 men - 5 days + 3 men - 15 days) <br /> EQUIPMENT: <br /> GD 83 Jackleg (in Misc Costs) <br /> Grout Mixer & pump ($8500 value) 1 mo $ 700 <br /> @ $700/mo; $250/wk 1 wk $ 250 <br /> Locomotive (in Misc Costs) <br /> DIRECT LABOR @ $16. 39/hr 800 $13112 <br /> BENEFITS @ 35% of wages $4589 <br /> INDIRECT LABOR (outside man) @ $16.39/hr 240 $3934 <br /> BENEFITS @ 35% of wages $1377 <br /> MATERIALS: <br /> Packers @ $120 ea 4 $ 480 <br /> Type V Portland Cement <br /> (94# bags) @ $5.60 20 $ 112 <br /> Type III Portland Cement <br /> (94# bags) @ $9.50 40 S 380 <br /> SubTotal $24934 <br /> MISC COSTS <br /> ENGINEERING DESIGN Lump Sum $4535 <br /> ENGINEERING INSPECTION (Design Engineer) $3067 <br /> MATERIALS TESTING Lump Sum $ 806 <br /> MISC SMALL HAND TOOL USAGE Lump Sum $3000 <br /> MISC MATERIALS (ie nails, bits, wire, <br /> hangers, oxygen, acetylene, etc) Lump Sum $3000 <br /> DIESEL Lump Sum $ 700 <br /> ELECTRICITY $1600/mo 3 $4800 <br /> AT LOCOMOTIVE & FLATCARS @ $6000/mo 3 $18000 <br /> COMPRESSOR @ $3000/mo 3 $9000 <br /> AIR-BEAN 25 PUMP @ $400/mo 3 $1200 <br /> 1 H.P. SUMP PUMP $480 purchase 1 $ 480 <br /> GD 83 JACKLEG @ $375/mo 3 $1125 <br /> PHONES - COMMUNICATION SYSTEM TO SURFACE <br /> @ $800 purchase 1 $ 800 <br /> LOADER (outside) @ $6000/mo 3 $18000 <br /> SAFETY SUPPLIES Lump Sum $3000 <br /> SubTotal $71513 <br /> TOTAL AMERICAN TUNNEL BULKHEAD DIRECT COSTS $341,010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.