My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-10-25_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1996-10-25_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2021 4:05:40 PM
Creation date
7/3/2012 7:19:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
10/25/1996
Doc Name
EPA- 3rd Qtr 1996 Rpt
From
Sunnyside Gold Corp
To
EPA
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II I I II I II I II IIII III <br /> 999 <br /> St111 NYSIDE GOLD CORPORATIOl1T <br /> AN ECHO BAY COMPANY <br /> P.O. Box 177 .Silverton, CO 81433 <br /> Phone (303) 387-5533 .Telecopy (303) 387-5310 �'I / j 1-7 /`7- Sze <br /> October 24 , 1996 DENVR <br /> FF[CE <br /> Attention: Ron Zdyb / <br /> Mail Code: 8D2-W-GWa <br /> /U.S. Environmental Protection Agency y <br /> J Underground Injection Control (UIC) <br /> 999 18th Street, Suite 500 <br /> Denver, CO 80202-2466 ;}:`v;aology <br /> RE: - EPA File No. C05000-03745, San Juan County, Colorado <br /> - 3rd_9_uartgr,, 199&-.FepQrt (July - September) <br /> Dear Mr. Zdyb: <br /> In accordance with the quarterly reporting requirements of EPA's <br /> June 26 , 1996 Rule Authorization letter for injection of water and <br /> alkaline material into the Sunnyside Mine, Sunnyside Gold <br /> Corporation (SGC) submits the following report. This report covers <br /> the period from start of alkaline injection, July 18, 1996, through <br /> the end of the quarter, September 30 , 1996. <br /> Terry Tunnel Bulkhead <br /> The Terry Tunnel bulkhead pressure is 8 psi . This pressure will <br /> remain constant until the mine pool rises above the 11,600' <br /> elevation. <br /> Inspection of the bulkhead and immediate tunnel area did not <br /> reveal any reason for concern or give any indication that the <br /> bulkhead is not performing as designed. <br /> American Tunnel Bulkhead <br /> The American Tunnel bulkhead was inspected, gage pressure readings <br /> taken and fluid samples analyzed for pH, conductivity and <br /> temperature more frequently than the requirements of Items 3 . and <br /> 4 . in the Rule Authorization letter. This information is attached. <br />
The URL can be used to link to this page
Your browser does not support the video tag.