Laserfiche WebLink
Ms. Sarah Johnson <br /> Gold Prince Project <br /> Page 3 <br /> Proposal for Work Plan <br /> To reconcile these concerns and still achieve all SGC permit ' <br /> releases, SGC will carry out the Gold Prince Work Plan as described <br /> below. <br /> (1) As described in SGC's letter of September 3 , 1996, SGC <br /> will place two bulkheads within the Gold Prince No. 1 <br /> Level portal. These bulkheads will turn the flow of mine <br /> discharge water to the Sunnyside Mine Pool and return the <br /> near surface fracture flow water back to its natural flow <br /> path within the surface fracture system. <br /> (2) SGC will construct, utilizing the existing County Road <br /> above the mine waste dumps, a runon diversion ditch to <br /> divert surface flows around the site. <br /> (3) SGC will consolidate the waste piles W-1 through W-6 into <br /> the waste piles W-7 and W-8 (map attached) . Tailings <br /> piles T-1 through T-3 will be entombed within the <br /> consolidated waste piles W-7 and W-8. The top surface of <br /> the consolidated material will be capped with overburden <br /> material. For historical accommodation, the slopes of <br /> the consolidated piles will be left uncapped and steep <br /> resembling a historical mine dump. These slopes will <br /> have a mostly non-reactive waste rock cover. <br /> (4) SGC will amend, seed and fertilize areas where material <br /> was moved. <br /> (5) SGC will not disturb the midden piles, waste rock or <br /> structures in the northern end of the townsite but will <br /> divert the streamflow from crossing the waste pile <br /> located next to the Hanson Mill remains. Overburden <br /> cover will be obtained from the area under the enlarged <br /> W-8 pile and County Road realignment. <br /> (6) SGC will deed to San Juan County the four patented mining <br /> claims; Hidden Treasure Sur. No. 5010, Pride of the <br /> Rockies Sur. No. 7628, Protection Sur. No. 20003 , and <br /> Doctor Mill Site Sur. No. 2093 . <br />