My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-28_PERMIT FILE - M2012032 (22)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012032
>
2012-06-28_PERMIT FILE - M2012032 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:02:02 PM
Creation date
7/2/2012 3:45:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
PERMIT FILE
Doc Date
6/28/2012
Doc Name
Appendix 8-11
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Star Mine Operations, LLC Revenue Mine MCP Plan 2012 <br />Introduction <br />Purpose <br />The purpose of this Material Containment Plan (MCP) is to describe measures implemented by Star <br />Mine Operations to provide guidance for the storage, use, cleanup, training, and reporting associated <br />with the use of mill chemicals on site. In addition, the MCP prepares Star Mine Operations to respond in <br />a safe, effective, and timely manner to mitigate the impacts of a site emergency. <br />This MCP is used as a reference for chemical storage information and testing records, as a tool to <br />communicate practices on preventing and responding to spill/releases with employees, as a guide to <br />facility inspections, and as a resource during emergency response. <br />This Plan provides guidance on key actions that Star Mine Operations must perform to ensure safety of <br />the employees, facility and environment: <br />• Complete monthly and annual site inspections as outlined in the Inspection, Tests, and Records <br />section of this Plan (Section 3.6) using the inspection checklists. <br />• Perform preventive maintenance of equipment, secondary containment systems, and spill/release <br />prevention systems described in this Plan as needed to keep them in proper operating conditions. <br />• Conduct annual employee training as outlined in the Personnel, Training, and Spill Prevention <br />Procedures section of this Plan (Section 3.7) and document them on the log. <br />• Review the MCP Plan at least once every five (5) years and amend it to include more effective <br />prevention and control technology, if such technology will significantly reduce the likelihood of a <br />spill event and has been proven effective in the field at the time of the review. Plan amendments, <br />other than administrative changes discussed above, must be recertified by a Professional Engineer on <br />the certification page in Section 1.2 of this Plan. <br />• Amend the MCP Plan within six (6) months whenever where is a change in facility design, <br />construction, operation, or maintenance that materially affects the facility's spill potential or <br />materials stored onsite. The revised Plan must be recertified by a Professional Engineer (PE). <br />Review the Plan on an annual basis. Update the Plan to reflect any "administrative changes" that are <br />applicable, such as personnel changes or revisions to contact information, such as phone numbers. <br />Administrative changes must be documented in the Plan review log, but do not have to be certified by a <br />PE. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.