Laserfiche WebLink
Cement Creek Influent to Wastewater Treatment Facility - <br /> Sampled monthly while Cement Creek is diverted. Weekly flow measurements will be taken <br /> until the diversion stops. <br /> (iii). American Tunnel Treatment Facility Effluent - Sampled monthly. <br /> (iv). Cement Creek below its confluence with the American Tunnel <br /> effluent - Sampled monthly until Cement Creek diversion and treatment of American Tunnel <br /> waters ceases. This is known as water quality monitoring station C-20. <br /> (v). Terry Tunnel Wastewater Treatment Facility Influent - If flow <br /> exists, inflow will be sampled monthly, when accessible, until no flow exists or permits are <br /> terminated. Weekly flow measurements will be taken when accessible until no flow exists or <br /> permits are terminated. <br /> (vi). Terry Tunnel Wastewater Treatment Facility Effluent - If <br /> treatment is required due to flow from portal, effluent will be sampled, when accessible, <br /> monthly until no flow exists. <br /> (vii). Monitoring required by SGC's MLR permit will continue until <br /> SGC is released from its obligations by DMG. Monitoring required by SGC's CDPS permits <br /> will continue until SGC is released from those permit obligations. <br /> b. Mitigation Sites. The receiving stream, both upstream and downstream <br /> of, and any water flowing from, the mitigation project sites identified below, will be <br /> monitored starting in the first field season of work activity at such project, and ending two <br /> 3"/1./.212e96 17 <br />