My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-28_PERMIT FILE - M2012032 (16)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012032
>
2012-06-28_PERMIT FILE - M2012032 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:02:02 PM
Creation date
6/28/2012 3:23:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
PERMIT FILE
Doc Date
6/28/2012
Doc Name
112Dā(1)ā APPLICATION PACKAGE EXHIBIT H- RULE 8
From
STAR MINE OPERATIONS
To
DRMS
Email Name
RCO
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the access road gate will also be locked to prevent unauthorized access. Inspections will be done on <br />all underground chemical storage once every 2 weeks. <br />7. Facilities Evaluation <br />Maps and drawings describing the underground mill layout are given on 7 drawings provided by <br />Samuels Engineering, which are included in Appendix 7. <br />7.1 Mill Description <br />Crushing <br />Mined ore from the main mine tunnel will be arriving at the mill dump point via rail cars. The rail <br />cars will be dumped into one of two hoppers depending on the ore materials source. (The hoppers <br />will have a 12 inch grizzly on top with a rock breaker to prevent oversize material from entering the <br />plant.) After the ore is in the hopper it will be pulled out using a feeder and be placed on a 24 inch <br />wide belt conveyor. Over the belt conveyor will be a magnet for removal of tramp iron from the <br />feed, which can damage the crushing equipment. The belt conveyor will feed a 400 x 600 jaw <br />crusher. The jaw crusher will crush the material from 12 inches to 1.5 inches. The product from <br />the jaw crusher will be sent on another 24 inch wide conveyor to an inclined screen. The inclined <br />screen will sort the material into two size fractions with a separation point of 3/8 of an inch. All the <br />material smaller than 3/8 of an inch will be sent to a fine ore bin. All the material which is coarser <br />than 3/8 of an inch will be sent via an 18 inch conveyor to a 3 foot short head cone crusher. The <br />cone crusher will crush the feed material to 3/8 of an inch or finer. The product from the cone <br />crusher will be combined with the jaw crusher product on the 24 inch belt conveyor and brought to <br />the screen for size separation. <br />Grinding Circuit <br />The material from the fine ore bin will be pulled out using a scaled belt feeder to ensure accurate <br />ball mill feed tonnages. The material will be fed into a 7 foot diameter and 12 foot long ball mill <br />which will grind the feed material to eighty percent passing 150 mesh. The ball mill will grind in <br />closed circuit with a bank of 8 cyclones. A portion of the cyclone underflow product will be sent <br />Revenue Mine August 2012 T - <br />
The URL can be used to link to this page
Your browser does not support the video tag.