Laserfiche WebLink
June 19, 2012 C-1981-012/New Elk Mine JHB <br /> <br /> <br /> <br />No other concerns were noted at the load out. <br /> <br />TOPSOIL Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> <br />The construction of the acceleration lane onto State highway 12 at the mine entrance road has begun. Topsoil and <br /> topsoil or subsoil pile as appropriate. <br /> <br />A small pile of topsoil is being stored on the east end of the topsoil and subsoil storage area. This topsoil was <br /> material. <br />this small pile needs to be moved to the large topsoil pile. The topsoil stockpile has emergence of annual <br />vegetation. A stabilization seed mix needs to be applied to the topsoil stockpile to stabilize the pile from wind and <br />water erosion, and to minimize invasion by noxious species. <br /> <br />NECC anticipates utilizing portions of the subsoil pile and topsoil pile for covering the DWDA #2 pile this season. <br /> <br /> <br />DOCUMENTS RECEIVED None <br />OTHER (SPECIFY) <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 11 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br />614 <br />Page of <br /> <br /> <br />