Laserfiche WebLink
Longfellow Koehler Project <br /> Page 8 <br /> Conting_enc,, Plans <br /> Prior to draining of the pond,the pH will be raised to minimize the metal content of the pond <br /> water. <br /> Downstream sediment catchments will be installed to minimize downstream effects during <br /> remediation. <br /> If a favorable onsite location cannot be found for onsite relocation of mine wastes the mine <br /> wastes will be trucked to SGC's Tailings Pond#4 at the Mayflower Mill. Under SGC's MLR permit <br /> (M-77-378)this material can be consolidated into Tailings Pond#4. <br /> Legal Right to Enter and Conduct Activities <br /> SGC has verbally discussed this concept in general terms with the property owner. No work <br /> will commence until an acceptable access agreement is reached. <br /> The property is owned by the following: <br /> Osiris Gold 50% <br /> Sial Corp. 50% <br /> Submitted by Sunnyside Go Id <br /> Corporation <br /> William B. Goodhard <br /> Resident Manager <br /> Attachments: <br /> Description of applicable water quality standards and use classifications <br /> Location Map <br /> Site Maps (Koehler and Longfellow Mine Site) <br /> Existing quality and quantity information at M-1, M-2, M-2A, M-34 and A-72 <br /> Design concept for closure for the Longfellow Koehler Mine Complex <br />