My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-02-08_HYDROLOGY - M1977378 (5)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1996-02-08_HYDROLOGY - M1977378 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2021 2:53:12 PM
Creation date
6/28/2012 11:11:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
2/8/1996
Doc Name
Remediation Work Plan: Longfellow Koehler Project
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Longfellow Koehler Project <br /> Page 7 <br /> Monitoring <br /> Monitoring points for this project will consist of upstream,downstream as well as flows from <br /> adits, seeps and dumps. Monitoring will start in 1996 and continue until two years after the project <br /> is completed. Monitoring for run on, runoff and waste isolation will occur four times yearly, and <br /> particularly once in the spring and fall. All samples taken will be analyzed for dissolved metals Zn, <br /> Fe, Al, Mn, Cd, and Cu; total sulfate, hardness and a field pH will be taken as well as field <br /> measurements for flow. All monitoring results will be submitted by the 28th day of the month <br /> following receipt of analytical results as well as included in the annual reporting. <br /> Reporting <br /> SGC will submit reports to WQCD and DMG annually at the same time of SGC's annual <br /> Mined Land Reclamation submittal. SGC will submit annual reports for this project including <br /> finalized engineering drawings, with estimates of operation, maintenance and replacement <br /> requirements. <br /> Once all reclamation activities included in the plan are complete, a final report will be <br /> submitted. <br /> Budget <br /> Sunnyside Gold Corporation will fund this project. <br /> Remedial Goals and Objectives <br /> Reduction of dissolved zinc (70%), flowing past the M-02 sampling point at the Koehler <br /> Longfellow site on Red Mountain Pass. Actions taken to help reduce dissolved zinc should also <br /> improve the qualtiy of low pH, metal laden waters flowing into the headwaters of North Mineral <br /> Creek by: <br /> (1) design of a passive bio treatment system to be given to WQCD; <br /> (2) reduction of acidity in the headwaters by isolating or limiting abilities of waters to <br /> react with pyrite and other sulfide minerals; <br /> (3) reduction of exposure to waste material by snowmelt, rainwater and intermittent <br /> streams; and <br /> (4) visually reclaim area to accepted reclamation standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.