My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-02-08_HYDROLOGY - M1977378 (5)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1996-02-08_HYDROLOGY - M1977378 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2021 2:53:12 PM
Creation date
6/28/2012 11:11:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
2/8/1996
Doc Name
Remediation Work Plan: Longfellow Koehler Project
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Longfellow Koehler Project <br /> Page 2 <br /> The project is located within a belt of chimney type ore deposits along the northwesterly rim of the <br /> Silverton Caldera. All volcanic rock types in this area are either from the Burns or Henson <br /> Formations. There are intrusive rocks found along the concentric and radial faults associated with <br /> the volcanic activity. The area in general is considered to be highly mineralized. <br /> The project area consists of a shaft with a small access drift and corresponding waste dump, <br /> two. collapsed discharging portals with corresponding waste dumps, two mine waste dumps <br /> (estimated to contain 20,000 cubic yards) and a low pH natural pond with sediments containing <br /> metal precipitates. All water flowing through or across disturbances is exposed to pyrite and other <br /> heavy metals as well as the acidic conditions of the pond. The south collapsed adit has a general <br /> Northeasterly bearing toward Carbon Lake. The headwaters of Mineral Creek are a substantial <br /> contributor of dissolved Fe, Al and Zn as defined by the 1991-1994 sampling results of Water <br /> Quality Control Division. The site features are identified on the attached drawings. <br /> Site Loading Estimate <br /> Loading from this site is due to the intermixing of adit flows, drainage from the small basin <br /> and stormwater through a common discharge point(M-02),that has been monitored multiple times. <br /> The average results of the monitoring of M-02 for quantity and quality was used to estimate the <br /> impact of dissolved zinc from adit flows from this site. The average M-02 loading information was <br /> used and the assumption made that the same percentage attributable to waste dumps during a SGC <br /> sample session at the site is applicable to this average loading. <br /> Based on these assumptions and procedures, SGC estimates that the average daily loading <br /> for mine waste impacts at this site may be as much as 32.5 pounds of dissolved zinc per day. SGC <br /> is under no obligation to defend these estimates and they should only be used as an estimate. SGC <br /> does not represent that its mitigation project at this site will remove any specific percentage of metals <br /> loading from this site: the loading estimate contained herein does not form the basis of an <br /> enforceable permit obligation. <br /> Description of Project <br /> Hydrologic Controls <br /> Infiltration Controls <br /> The upland property has not been examined by SGC to see if there are any open stopes,glory <br /> holes or other subsidence features that may be adding water to the portal flows. The following will <br /> be done to determine whether infiltration controls have potential to reduce Adit flows. <br />
The URL can be used to link to this page
Your browser does not support the video tag.