Laserfiche WebLink
June 19, 2012 C- 1984 - 065 /Coal Ridge No. 1 Mine ZTT <br />An unapproved ditch has been constructed connecting into Ditch 3 just prior to Culvert C5. The ditch runs roughly <br />southeast from the pond and is approximately 150 ft" long, 1 "5 ft" deep and 1 "5 ft. wide. It appears the ditch was <br />created to catch additional runoff and redirect it to Ditch 3 to prevent additional erosion around the outlet of <br />Culvert C5. <br />F. <br />:y. <br />-i <br />4 <br />A <br />Sedimentation pond maintenance. <br />GENERAL MINE PLAN COMPLANCE: <br />T <br />r w <br />w.y <br />- <br />z . <br />W lM;. Ry <br />:y. <br />-i <br />4 <br />A <br />Sedimentation pond maintenance. <br />GENERAL MINE PLAN COMPLANCE: <br />Unapproved ditch connection to Ditch 3. <br />F <br />; -•' � v .�°� {t Ar. ' ti t -�6j' � � Ate. s <br />�• _ � .� tip. •� <br />Rodent hole in east embankment of sedimentation pond. <br />This NOV was written for the permittee's failure to have obtained approval of a sediment collection ditch prior to <br />its construction. During a Complete inspection conducted on June 19, 2012, it was observed that an unapproved <br />sediment collection ditch had been constructed at the site sometime between the June 19, 2012 inspection and the <br />prior Complete inspection of March 19, 2012. It appears that this ditch had been constructed at the same time <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 3 of 7 <br />Unapproved ditch uphill from sediment pond. <br />- <br />z . <br />Unapproved ditch connection to Ditch 3. <br />F <br />; -•' � v .�°� {t Ar. ' ti t -�6j' � � Ate. s <br />�• _ � .� tip. •� <br />Rodent hole in east embankment of sedimentation pond. <br />This NOV was written for the permittee's failure to have obtained approval of a sediment collection ditch prior to <br />its construction. During a Complete inspection conducted on June 19, 2012, it was observed that an unapproved <br />sediment collection ditch had been constructed at the site sometime between the June 19, 2012 inspection and the <br />prior Complete inspection of March 19, 2012. It appears that this ditch had been constructed at the same time <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 3 of 7 <br />Unapproved ditch uphill from sediment pond. <br />