My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (280)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (280)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:38:24 AM
Creation date
6/25/2012 1:45:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section Q . The road was constructed by `lid-Continent in <br /> 1956 and is maintained by the company . There are no plans <br /> to improve , widen or alter this road during the term of this <br /> permit period . <br /> The design and construction of the <br /> access road complies with the standards specified in para- <br /> graph 4 . 03 . 2 of the CXLRD Rules and Regulations for Coal <br /> Mining . <br /> ( 3) Haul roads <br /> The twelve miles of haul roads within <br /> Coal Basin are used by buses , trucks and administrative <br /> vehicles to transport :ten , equipment and supplies within the <br /> five mine and preparation plant complex . Thev are also used <br /> by the 30 ton off-hi, hway trucks to transport the run-of- <br /> Nine coal from the mines to the preparation plant . These <br /> haul roads were constructed on lands owned by Aid-Continent , <br /> on Forest Service lands and within a wderal coal lease <br /> area . Authorities to construct and utilize these roads are <br /> contained in a special use permit from the Forest Service <br /> and b;; the terms of the i o2wral coal lease ( See Chapter 1 , <br /> Section Q . <br /> The haul roads , which connect the <br /> preparation plant at 8 , 000 feet .with the mines at approxi- <br /> mately 10, 000 feet elevation ;were constructed with grades <br /> ranging from 21 to 9% on the most stable slopes . These haul <br /> roads have been desinned for 365 days per year availability . <br /> Note: See next page ( 54 . 1) for haul road design references . <br /> -54- <br />
The URL can be used to link to this page
Your browser does not support the video tag.