My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (280)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (280)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:38:24 AM
Creation date
6/25/2012 1:45:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . 04 . 6 Geology Description <br /> 1. Comment The applicant must submit a structural <br /> contour map and isopach map of each coal seam to be <br /> mined. <br /> Reply See contour maps and isopach maps for each <br /> coal seam to be mined at Exhibits III-D-1 and 2 . <br /> Vol. 4 , Chap. III, (Add as Exhibits III-D-land 2) <br /> 2 . Comment The applicant must provide representative <br /> geologic cross sections of the permit area. <br /> Reply See Willard Owens geologic cross sections <br /> of the permit area at Exhibit III-D-3. <br /> Vol. 4 , Chap. III (Add as Exhibit III-D-3) <br /> 3 . Comment The applicant has evidently done extensive <br /> drilling on the permit area, but drill hole locations <br /> and representative drill logs have not been included in <br /> the application. The applicant must submit this <br /> information. <br /> Reply Drill hole locations - see Exhibit III-C-1. <br /> Drill hole data summary - Table III-C-4 . <br /> Also see Full Report for drill hole data. A copy <br /> of this report has been furnished MLRD_. <br /> 4 . Comment A general geology map showing the structural <br /> features of the area surrounding Coal Basin must be <br /> submitted. <br /> Reply This information is contained in Exhibit III- <br /> C-1. <br /> Vol. 4 , Chap. III (See Exhibit III-C-1) <br /> 5. Comment The applicant must submit analyses of each of <br /> the major strata to be mined through during construction <br /> of the rock tunnel. Also, the one analysis of rock <br /> tunnel waste submitted should be expanded to include <br /> the required parameters . A list of required analyses <br /> is attached. The parameters on the list are required <br /> because no data exists on whether any of the elements <br /> of the overburden chemical analysis may pose a problem <br /> in this area. If analysis shows that the level of any <br /> parameter will pose no problems, then this analysis may <br /> be dropped from the required analyses for surface and <br /> groundwater quality. <br />
The URL can be used to link to this page
Your browser does not support the video tag.