Laserfiche WebLink
13 of I6 <br /> COAL BAS IN PERMIT WORKSHEET <br /> Time Esc. <br /> Requirements <br /> Responsible Comments Required Cost S It <br /> D. General Facilities Plans - ponds , impoundments , banks , dams , and <br /> embankments (784. 16) <br /> 1 . Shall be prepared and certified by a qualified professional engineer. Bill 7 <br /> 2, Contain a description, map and cross section of all structures and Bill <br /> their location. <br /> 3. Contain preliminary hydrologic an'd geologic information. Consultant <br /> 4. Survey describing potential effect on structure from subsidence. Bill plus M.J. Turnipseed <br /> 5, Certified statement on schedules when detailed design plans for Bill <br /> structures will be submitted, <br /> 6. All detailed design plans For structures shall comply with the Bill <br /> requirements outlined in Par, 817 of the permanent regulations <br /> and with the Mine Safety and Health Administration regulations , <br /> 30 CFR 77. 216, <br /> E . Protection of Public Parks and Historic Places (784. 17) <br /> 1 . Description of measures to minimize or prevent adverse impacts . Doug <br /> 2. Obtain approval of regulatory authority and other interested George <br /> agencies . <br /> F. Relocation or Use of Public Roads (784. 18) <br /> Describe, with appropriate maps and cross sections , measures to Bill <br /> ensure protection of public and landowners interests , <br /> G. Underground Development Waste (784. 19) <br /> Prepare plan, with maps and cross section drawings , describing Bill <br /> disposal areas and sites for placing underground development <br /> waste and excess spoil generated at surface areas to include; <br /> geotechnical investigation , design , construction , operation, <br /> maintenance and removal of the structures . <br />