My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1982-11-16_INSPECTION - C1981017
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981017
>
1982-11-16_INSPECTION - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 6:43:31 PM
Creation date
6/22/2012 2:39:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Inspection
Doc Date
11/16/1982
Doc Name
InspectionReports/ Documents for year 1982
Inspection Date
11/11/1982
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> I_TI. Problems, Recommendations and Compliance Dates <br /> The operator is advised that the following problems have been identified during the inspection <br /> and that failure to correct the problems may result in the Division taking an &vFCRCEKEPJT ACTION <br /> pursuant to CRS 1973, as amended, 34-33-123. (Recoumrendations and compliance dates are to be <br /> clearly noted. Dates are to be specific, e.g. , January 31, 1981 and underlined) <br /> 8) Clean or replace the culvert east of the warehouse by July 20, 1982. <br /> 9) Clean the three culverts noted in Section II of this inspection report by June <br /> 21, 1982. <br /> 10) Submit an acceptable plan for removal of snow from the mine benches to insure that <br /> erosion is not increased and to insure that the prevailing hydrologic balance is protected <br /> by August 20, 1982. <br /> 11) Clean the coal processing waste from the bridge over the Dutch Creek Flume by <br /> June 4, 1982. <br /> 12) Clean the spillway of the Iff pond by June 4, 1982. <br /> 13) - Clean the MK pond by June 21, 1982. <br /> 14) Repair the berm along the north side of the preparations plant bench by June 21, <br /> 1982. <br /> 15) Clean the small pile of coal waste near the head of the perimeter ditch by June 21, <br /> 1982. <br /> 16) Clean the concrete ditch along Coal Creek near the wash plant by June 21, 1982. <br /> 17) Clean the ditch below the main coal stockpile as soon as possible, and no later <br /> than July 2, 1982. <br /> 18) Clean the sediment from the bus garage pond by July 2, 1982•. <br /> 19) Clean sediment from pond 007 by June 21, 1982. <br /> 20) Repair the berm on the south side of the old strip pit near mine #1 by June 21, <br /> 1982. <br /> 21) Regrade mine #2 bench or build a berm between the concrete walls by June 21, 1982. <br /> 22) Clean the ditch on the north side of mine #3 bench by June 21, 1982. <br /> 23) Place a straw dike on the southeast side of the mine #2 stockpile by June 22, 1982. <br /> 24) Dumping of coal on the south side of the mine #2 stockpile must cease immediately. <br />
The URL can be used to link to this page
Your browser does not support the video tag.