Laserfiche WebLink
I?. Problems, Pecommencatiors and Compliance Dates <br /> The operator is ad,,,i.sed that the following pro7lerrs ha e been identified durincr inspections <br /> and that fsilure to correct the problems may r=sult in the Division taking an ENFORCEMENT <br /> ACTION pursuant to CPS 1973, as amended, 34-33-123. (Recommendations and compliance dates are <br /> to be clearly noted. Dates are to be specific, e.g. , January 31, 1982 and underlined.) <br /> 017-82-29 Sediment must be cleaned out of the preparations plant slurry pond by <br /> November 15, 1982. <br /> 017-82-45 The upper pond of the four below the Coal refuse pile must be cleaned by <br /> November 19, 1982 <br /> 017-82-46 A topsoil marker must be put upon the topsoil stockpile at the new trash <br /> dump by November 19, 1982, <br /> 017-82-25 Coal must be cleaned up from the undistrubed area below the f1ine No. 2 <br /> coal stockpile when the stockpile is removed enough to facilitate cleanup. <br />