Laserfiche WebLink
1) This problem was not resolved because snow fell shortly after the <br /> problem was noted. The deadline was extended with the hope that the <br /> snow would melt sufficiently to allow the culverts to be repaired. However <br /> this did not occur. Also, the Division felt that this problem should not <br /> cause environmental harm since snow melt is gradual and the culvert ends are <br /> not deformed to a high degree. Therefore, if the culverts are repaired <br /> following snow melt, no environmental harm would occur. <br /> ys <br />