Laserfiche WebLink
!. Status of Problem Resolution <br /> Tale following items % oncern problems identified a-: previcus inspection. Problems are c7aSS4f�od <br /> into three categories. These are: (1) croblems resolved; (?) resoluticn still process; and <br /> (3) operator delinquent. The date that the problem is resolved or r,^e date that the operator <br /> is deemed delinquent is to be clearly stated. <br /> 1. Backfill and compact the area under the conveyor belt, where water piping <br /> occurred by December 28, 1981. Problerr Resolved. <br /> 2. Replace the riser on the lower refuse pile dewatering device by December 28, 1981. <br /> Resolution in Progress. <br /> 3. Place a berm along Coal Creek northwest of the thermal dryers by December 18, 1981. <br /> The operator was given a 10 day extension for constructing the berm. Resolution in <br /> Progress. <br />